Construction started in February of 2011 with Hawkins Construction as the Prime Contractor
Major work included (32) bridge mounted lighting poles, (2) 89′ overhead sign structures, (1) 110′ sign structure, (1) 95′ overhead DMS sign structure with Daktronics DMS sign installation, (7900′) electrical circuits, (1088 sq ft) of Type B extruded back sign panels, (12000′) 2″ galvanized rigid steel conduit system installed in the concrete barrier bridge rail, and bridge navigation lighting system