I80 Eastbound Bridge over
the Missouri River

content-image

Construction Started in
February of 2011

  • Construction started in February of 2011 with Hawkins
    Construction as the Prime Contractor
  • Major work included (32) bridge mounted lighting poles,
    (2) 89′ overhead sign structures, (1) 110′ sign structure,
    (1) 95′ overhead DMS sign structure with Daktronics DMS
    sign installation, (7900′) electrical circuits, (1088 sq ft) of
    Type B extruded back sign panels, (12000′) 2″ galvanized
    rigid steel conduit system installed in the concrete barrier
    bridge rail, and bridge navigation lighting system