I80 Westbound, Indian Creek to West System Interchange
Construction stated in June of 2013 with Peterson Contractors Inc. as the Prime Contractor.
Major Work included (21) 50′ double arm lighting poles with 21′ drilled shaft foundations in sandy soils with a high water table, (10) triangular slip base,50′ lighting poles on highway ramps, (12000′) of electrical circuits, (14) steel breakaway sign post, and (2900 sq ft) of Type B extruded back sign panels. Sadler Electric partnered with PCI Structures to install a total of (6) box truss and cantilever sign structures ranging from 33′ to 110′ long throughout this project.