Phase 2

I80 Westbound, Indian Creek to West System Interchange

content-image

Construction stated in June of 2013 with Peterson Contractors Inc.
as the Prime Contractor.

  • Major Work included (21) 50′ double arm lighting poles with 21′ drilled shaft foundations in sandy soils with a high water table, (10) triangular slip base,50′ lighting poles on highway ramps, (12000′) of electrical circuits, (14) steel breakaway sign post, and (2900 sq ft) of Type B extruded back sign panels. Sadler Electric partnered with PCI Structures to install a total of (6) box truss and cantilever sign structures ranging from 33′ to 110′ long throughout this project.