I80 Westbound & I29 Northbound, West System Interchange
Construction stated in May of 2015 with Peterson Contractors Inc. as the Prime Contractor
Major work included the installation of (4) 120′ high mast tower lighting poles with 48″ diameter drilled shafts at 25’ deep, (1260 sq ft) of Type B extruded back sign panels, (1) 33’ Cantilever sign structure, (4) 66’ custom overhead sign structures, (1) 95’ overhead sign structure, (1) 115’ overhead sign structure, (1) 120’ overhead sign structure, (64) Lighting pole and footing removals, and (6000’) of electrical circuits.
The large signing component of this project required (1550 CY) of excavations, (450 CY) of structural concrete, and (57500lbs) of epoxy reinforcing steel in order to construct the 10’x25’ with vertical stem wall formed sign foundations
This project also included an ITS infrastructure package of (12800’) of 2”/3” HDPE conduits with fiber optic vaults, ITS equipment cabinets, poles, devices, and power cabling.